Lumina Metals (LMCU) Investor presentation summary
Event summary combining transcript, slides, and related documents.
Investor presentation summary
13 Aug, 2026Project overview and history
Three major sediment-hosted copper-silver deposits discovered in western Poland, including Nowa Sól, Sulmierzyce, and Mozów, with over $125M invested since 2011 and more than 51,000m drilled.
Nowa Sól is among the largest undeveloped copper and silver projects globally, with a measured and indicated resource of 604Mt at 1.24% Cu and 38.3g/t Ag, and inferred resource of 112Mt at 1.08% Cu and 28.9g/t Ag.
Sulmierzyce project holds an inferred resource of 308Mt at 2.09% Cu and 31.9g/t Ag, with potential for a spinoff focused on resource growth.
Strategic cooperation with KGHM, Poland’s leading copper producer, is supported by a recent letter of intent.
Market position and resource rankings
Poland ranks #6 globally in copper resource endowment and #1 in silver resource endowment.
Nowa Sól is positioned among the world’s largest copper and silver development projects by contained metal.
Poland is the 13th largest copper producer and 4th largest silver producer globally.
Project economics and production profile
Nowa Sól’s PEA highlights a 20+ year mine life, with average annual production (years 1-10) of 290Kt Cu and 28Moz Ag.
Pre-tax NPV (7%) is $8.3B and IRR is 20.5%; post-tax NPV (7%) is $1.6B and IRR is 10.8%, based on $4.75/lb Cu and $37.50/oz Ag.
At higher price assumptions ($6/lb Cu, $90/oz Ag), pre-tax NPV (7%) rises to $22.4B and IRR to 31.9%.
By-product AISC averages $1.17/lb Cu (years 1-10), placing the project in the lower half of the global cost curve.
Forecasted annual EBITDA averages $2.5B (years 1-10), with significant free cash flow generation.