Invinity Energy Systems (IES) Status update summary
Event summary combining transcript, slides, and related documents.
Status update summary
17 Jul, 2026Strategic milestones and operational progress
Achieved key 2024 milestones, including shipping orders for Rincon, launching ENDURIUM, and closing commercial deals, positioning for commercial scale-up in 2025.
Secured the STS contract and up to £10 million in grant income, resulting in 90% revenue coverage for 2025.
Trading is in line with FY25 revenue expectations, with achieved milestones in shipping and product launch, and other targets on track.
Over 1,500 vanadium flow battery modules deployed globally, providing a strong operational track record and data advantage.
Maintains a constrained but managed balance sheet, with a focus on cost discipline and cash preservation.
Product innovation and market feedback
ENDURIUM launch met or exceeded performance expectations, delivering 15% more energy per unit and direct cost savings for customers.
AI-driven analysis of operational data is optimizing battery efficiency, longevity, and cost structure.
Modular design and semi-automated manufacturing enhance scalability, quality control, and cost competitiveness.
Strong customer validation with follow-on orders and growing demand, especially for non-lithium, fire-safe solutions.
First ENDURIUM battery commissioned and operating in Spain, with data feeding into product development.
Manufacturing and cost optimisation
New 2,400 sq. m factory opened in the UK; semi-automated production line at Bathgate to double output by April 2025.
Delivered a 40% cost reduction on ENDURIUM versus previous products, with further cost savings targeted through supply chain optimization and manufacturing scale.
24% cost reduction achieved for ENDURIUM since launch through value engineering, supply chain enhancement, and performance improvements; further reductions expected.
Modular design and semi-automated manufacturing enhance scalability, quality control, and cost competitiveness.
Latest events from Invinity Energy Systems
- Income up 511% to £22.0m, debt-free, £53.2m cash, strong pipeline supports profitability outlook.IES
H2 2023 - H1 2024 delivered £1.6m income, strong cash, and delayed revenue as Mistral launch nears.IES
H1 2024 - Revenue dropped 77% amid product shift, but cost controls and cash position improved.IES
H2 2024 - Revenue up, new orders surged 193%, and cash strengthened by £25m investment.IES
H1 2025 - Revenue and grants up, Endurium costs down 66%, and global sales surged six-fold.IES
H2 2025