Dome Gold Mines (DME) Corporate presentation summary
Event summary combining transcript, slides, and related documents.
Corporate presentation summary
13 May, 2026Project overview
Nadrau Copper-Gold Project covers 33,213 ha under SPL1452, adjacent to the large undeveloped Namosi porphyry Cu-Au resource (11.4 Moz Au, 11.1 Mt Cu).
The project targets large porphyry systems and high-grade alkaline volcanic-hosted gold, similar to major Pacific Ring of Fire deposits.
Hosted by Miocene Colo Plutonic Suite, with two main prospects: Namoli and Wainivau.
Area exhibits geological, geochemical, and geophysical features typical of significant porphyry systems.
Regional context and prospectivity
Fiji is highly prospective for copper-gold porphyry-epithermal systems and is underexplored compared to other Pacific Rim countries.
Nadrau is located 15 km NE of Namosi, one of the world's largest undeveloped Cu-Au deposits.
The region hosts several major gold and copper deposits, including Vatukoula and Tuvatu gold mines.
Geophysical and geochemical characteristics
Wainivau prospect shows a prominent circular magnetic low anomaly (2.5 km across), typical of porphyry systems.
Elevated potassium in radiometric images indicates potassic alteration, a common porphyry feature.
Persistent 6.5 km long NW-SE linear anomalous structure identified across Namoli-Wainivau.
Large geochemical footprint with elevated Cu, Au, Ag, Zn, and Mo, confirmed by both historical and recent sampling.
Latest events from Dome Gold Mines
- Feasibility and EIA for Sigatoka advanced; $5.5M raised; net loss $4.6M; going concern risk.DME
H2 20256 Apr 2026 - Feasibility and EIA for Sigatoka advanced; net loss narrows; funding and going concern risks persist.DME
H2 202426 Mar 2026 - Net loss widened and cash reserves dropped as project progress hinges on new funding.DME
H1 202616 Mar 2026 - Sigatoka Feasibility Study advanced; $314K cash and 7 quarters of funding available.DME
Q1 2026 TU21 Dec 2025 - Sigatoka feasibility study advanced amid delays; strong cash and financing position maintained.DME
Q4 2025 TU5 Oct 2025 - Sigatoka feasibility progresses, new Nadroga gold anomaly found, and funding remains strong.DME
Q3 2025 TU22 Jun 2025 - Sigatoka feasibility and EIA advanced; $1.12M raised, $303K cash, $4.56M loans undrawn.DME
Q1 2025 TU13 Jun 2025 - Sigatoka project advances toward mining lease as Dome secures funding and key licence renewals.DME
Q4 2024 TU13 Jun 2025 - Losses persist as Dome Gold Mines advances Fiji projects and secures new funding.DME
H1 20256 Jun 2025