Anglo Asian Mining (AAZ) Corporate presentation summary
Event summary combining transcript, slides, and related documents.
Corporate presentation summary
26 Mar, 2026Strategic transition and growth objectives
Transitioning from a gold-focused to a copper-focused, multi-asset, mid-tier producer with operations restarting after a partial shutdown in 2023.
Five-year objective to reach ~36,000 tonnes of copper production per year through sequential mine openings, including Gilar (2025), Xarxar (2027), and Garadag (2028).
Restarting production at Demirli with potential for an additional 15,000+ tonnes of copper annually; exploration ongoing to further increase resources.
ESG practices are being strengthened, and financing discussions are underway with local banks and international institutions.
Resource base and project pipeline
Over one million tonnes of copper and 400,000 ounces of gold in JORC-compliant resources across multiple sites.
Gilar mine to commence production in Q1 2025, with 54,000 tonnes of copper and 255,000 ounces of gold in resources.
Xarxar holds 119,100 tonnes of copper, with first production targeted for 2026/7; Garadag contains 897,000 tonnes of copper, with mine design studies completed.
Demirli mine, acquired in 2022, features a well-developed open pit and 6 million tonne per annum flotation plant; evaluation and resource definition underway.
Operational and regional context
Operations based in Azerbaijan, a rapidly developing economy with strategic trade positioning and a skilled workforce.
Eight contract areas covering over 2,500 square kilometers, with active production, exploration, and evaluation across multiple sites.
Recent restart of agitation leaching and flotation processing at Gedabek following environmental audit and tailings dam upgrades.
AzerGold CJSC became the new local partner in 2024, strengthening local alliances.
Latest events from Anglo Asian Mining
- Record Q3 copper output and strong 2025 guidance signal a positive financial turnaround.AAZ
Trading update26 Mar 2026 - On track to become a major copper producer with new mines, strong ESG, and disciplined growth.AAZ
AGM 2025 presentation26 Mar 2026 - 2024 saw lower revenue and output, but 2025 guidance signals strong production growth.AAZ
H2 202426 Mar 2026 - Production and revenue fell sharply in H1 2024, but full operations are set to resume.AAZ
H1 202426 Mar 2026 - H1 2025 saw a return to profit, strong revenue growth, and new copper mine production.AAZ
H1 202526 Mar 2026