16 Nov, 2025Project overview and strategy
Focus on de-risking the Samphire Uranium project near Whyalla through pilot trials, utilizing in situ recovery mining methods.
Recent capital raise of AUD 17 million brings cash reserves to AUD 30 million, supporting studies over the next 6–12 months.
Project located near Whyalla, benefiting from strong infrastructure, skilled workforce, and proximity to iron and steel industries.
Experienced management and technical team with extensive uranium and ISR expertise, supporting project execution and stakeholder engagement.
Management emphasizes de-risking through staged development and regulatory engagement.
Technical progress and field trials
Field Recovery Trial to de-risk the project is scheduled for Q4 this year to Q1 next year, with a modular plant ready for on-site construction pending final approvals.
Field Recovery Trial (FRT) to run for approximately three months, providing key data for the Definitive Feasibility Study and supporting a Mining Lease Application in 2H 2025.
Plant for FRT fully fabricated and ready for on-site construction, with Whyalla-based contractor selected.
Pilot plant infrastructure will be available for future satellite field testing, including at Plumbush.
Experienced ISR and hydrogeological team assembled, leveraging expertise from similar projects.
Resource and exploration updates
Blackbush deposit supports 18 million pounds resource (14.2Mlbs Indicated, 3.8Mlbs Inferred) for startup mining, with staged expansion potential.
Plumbush deposit holds 2–3 million pounds, with further drilling required to define resource.
The broader tenement package could host 14–75 million pounds of uranium, with only 30% drill-tested and 72% of prospective areas untested.
Scoping study (Dec 2023) indicates 12-year mine life at 1.2 million pounds per annum, with potential to increase production rate to 1.5 million pounds per annum in DFS.
Big Lake Uranium Project in SA shows promising results from inaugural drilling, with follow-up delayed by weather and further exploration planned.
Latest events from Alligator Energy
- Samphire resource expanded, Big Lake discovery made, and $17.25M raised amid strong uranium market.AGE
H2 202531 Mar 2026 - Improved project economics, new uranium discovery, and strong cash position drive future growth.AGE
H2 202431 Mar 2026 - Nuclear energy demand is surging, but uranium supply remains tight, creating major investment opportunities.AGE
JMM & Tribeca Nuclear Energy Forum 202629 Mar 2026 - Samphire pilot plant completed, NT assets divested, net loss rises to $4.96M on impairment.AGE
H1 202622 Mar 2026 - Samphire Uranium Project advances toward production with robust economics and major exploration upside.AGE
Investor presentation16 Feb 2026 - Samphire Uranium Project advances with field trials, resource growth, and strong market demand.AGE
Noosa Mining Investor Conference3 Feb 2026 - Resolutions for share placement and options passed; Sandfire project moves to field trials.AGE
EGM 202523 Nov 2025 - Samphire Uranium Project advances toward trial production with robust financials and growth plans.AGE
AGM 2025 Presentation20 Nov 2025 - Samphire construction advances ahead of schedule, with strong cash reserves supporting growth.AGE
Q1 2026 TU28 Oct 2025